Finishing Strong Before the Builders’ Holiday: How to Avoid Summer Callbacks
By Herman Rabe, Technical Training Manager, Prominent Paints
Preparation is the most important step in any paint job. It accounts for roughly 95% of the success of the application, which is why planning and properly identifying the scope of work matter so much.
With December approaching, everyone wants the job finished before the holidays, and that is exactly when projects get rushed. As the Afrikaans saying goes, ‘n haastige hond verbrand sy mond: a hasty dog burns its mouth. You cannot force the conditions in your favour. This article looks at the critical factors that cause problems on summer projects, and how surface and air temperature, humidity and the weather affect a freshly applied coating.
Why heat causes failures that only show up later
Most painters have seen the skin that forms on paint when a container is left open in the sun. The same thing happens on a wall in direct sunlight. The surface is so warm that the paint dries too fast, and liquid trapped in the film can heat up and contribute to blistering.
If that sounds unlikely, walk barefoot on paving on a summer afternoon. You will be looking for shade within seconds. Now think about how a paint film behaves when it is applied in those conditions.
Blistering is only one result. Paint that dries too fast also fails to flow and level properly, which leads to lap marks and roller marks. The roller literally pulls the peaks of the paint to one side, and the colour ends up looking uneven and inconsistent.
Ceilings show this clearly. The limited airflow between the ceiling and the roof builds up heat, so roller lines appear no matter which direction you roll. In summer, paint ceilings early, before 09:00, for a flawless finish.
When and where to paint in summer
The ideal painting window in the summer months is from 07:00 to 15:00. Only start the topcoat once all surface preparation is complete, the primer is dry enough, and you have respected the recoating time stated on the container or data sheet.
Where you start matters too. Many painters begin at the front of the house so the client sees progress when they get home. Please don’t. Start on the northern side of the house and work anticlockwise. That keeps you painting in the shade, onto a cool surface that is not in direct sunlight.
Minimum and maximum surface temperatures get technical, because each product has its own rheology and additives, and therefore its own tolerances. As a rule of thumb, the surface temperature should generally be between 12 °C and 30 °C, which most coatings can tolerate. Whatever the temperature, paint in the shade during the summer months.
Touch-dry is not rain-safe
A sudden thunderstorm or high humidity can directly affect the performance of a freshly applied coating. We usually judge a new paint film by how well it hides, but if you took a close-up photo of a fresh exterior film and enlarged it, you would see small holes called pinholes. They form soon after application and allow the liquid in the coating to evaporate, much like the small holes that form on top of a cake as it rises in the oven.
This is why the correct roller matters. The roller you choose, based on the surface texture and the type of paint, directly affects film build, opacity, pinhole formation and, most importantly, the finish.
If only one coat, or two very thin coats, has been applied, rain can penetrate through those pinholes. This is moisture uptake through driving rain, and after the storm you will see water bags on the walls that faced the rain. The same thing happens in winter in Knysna, George and other areas with heavy mist and strong wind.
It happens because the coating has not yet achieved adhesion and is not cured. A water-based coating goes through several stages before it is fully cured, and only then can it withstand the environment it is exposed to.
Understanding the drying and curing stages
In favourable conditions, a water-based coating is touch dry in approximately 30 minutes to an hour. The recoating time before the final coat is about four hours. Then comes the cohesion window, which ranges from 2 to 24 hours between coats. Do not apply the second coat later than 24 hours after the first, because you will only achieve adhesion, not cohesion between the coats. This is one of the contributors to premature colour fading.
Full adhesion only develops after about 48 hours. That is why masking tape applied to a freshly painted surface pulls the paint off with it. Full cure for a water-based paint takes approximately 7 to 8 days, again depending on the weather.
High humidity extends all of these times. Warm air holds a lot more moisture than cold air, and when a coating is applied in humid conditions, a soapy residue (the surfactant) rises to the surface of the paint and runs down the wall. This is surfactant leaching, and you will recognise it as a sticky, shiny residue. To remove it, wipe the surface immediately with a rag and warm water, taking care because the coating is not cured and you could wipe off some paint. If it has dried into the film, you will need to prime and repaint, or leave it to weather away, which can sometimes take more than a year.
Recoat intervals under pressure
Recoating intervals are critical when a solvent-based primer has been used. The carrier is turpentine, so the primer dries slowly. It may look and feel dry to the touch after an hour, but it is still drying underneath. Apply a gloss enamel to window frames and add a second coat only six hours later, and the coating will wrinkle.
If waiting the 16 to 24 hours a solvent-based primer needs is not possible, consider a different primer. Solvent-based primers still penetrate better, but the right primer is dictated by the condition of the surface.
Once the solvent-based primer has had enough time to dry, the topcoat will achieve adhesion much faster than 48 hours. Apply a water-based topcoat over a primer that is only touch dry, though, and you will get crow’s feet: the topcoat splits and the primer shows through. Sometimes one extra day is all it takes for everything to be perfect, like the avo ripening in the drawer.
Prep shortcuts that come back as callbacks
Before painting any surface, three conditions must be met: the surface must be sound, clean and dry.
A sound surface is not friable or crumbling. A clean surface has been washed and rinsed, with no traces of oil, debris or bird droppings. A dry surface has a moisture content of 15% or below.
When filling cracks or holes, prime the surface before filling. Once the filler has dried, sand it, wipe it down and prime again before the topcoats.
Choose the system for the exposure, not the price
Never choose a paint on the price you see on the shelf. Ask one question: what will this paint be exposed to? The answer dictates the paint system, because the coating must withstand the macro- and micro-climate it will face. A bathroom coating must handle steam and condensation; the features section of the product data sheet tells you what each product is designed for.
Consider the substrate too. Metal surfaces such as roofs and palisade fencing expand and contract with temperature changes, so choose a coating that can move with the surface.
Use the support before the job starts
The cheapest time to solve a coating problem is before the quote. The Prominent Paints Professional Pact gives contractors and specifiers site inspections, technical specifications and third-party quality assurance, so the system, preparation and application are agreed before the first tin is opened. Before starting any exterior job this summer, ask for a site inspection where the substrate is in doubt, a written specification, and the current data sheets on site with your crew.
Frequently asked questions
What is the best time of day to paint exteriors in summer?
The ideal window in the summer months is from 07:00 to 15:00, working in the shade wherever possible. Start on the northern side of the building and work anticlockwise so you stay off surfaces in direct sunlight. Ceilings should be painted early, before 09:00, because heat builds up between the ceiling and the roof. Painting a hot surface causes the paint to dry too fast, which leads to roller marks, lap marks and blistering.
What surface temperature is safe for painting?
Each product has its own tolerances, so always check the data sheet. As a rule of thumb, most coatings tolerate a surface temperature between 12 °C and 30 °C. Measure the surface, not just the air, because a wall in direct sun can be far hotter than the air around it. Whatever the reading, paint in the shade during summer.
How long should I wait between coats of water-based paint?
In favourable conditions, the recoating time is about four hours. The second coat should be applied within the cohesion window of 2 to 24 hours; leave it longer than 24 hours and you only achieve adhesion, not cohesion between coats. High humidity extends drying times, so allow more time in humid weather. Full cure takes approximately 7 to 8 days, depending on the weather.
What is surfactant leaching, and how do I fix it?
Surfactant leaching is a sticky, shiny residue that runs down a freshly painted wall when the coating is applied in, or exposed to, high humidity before it has cured. The soapy surfactant in the paint rises to the surface and leaches down the wall. Wipe it off immediately with a rag and warm water, taking care not to remove uncured paint. If it has dried into the film, you will need to prime and repaint, or allow it to weather away over time.
Why did my enamel wrinkle over a solvent-based primer?
Solvent-based primers use turpentine as the carrier and dry slowly, even though they feel dry to the touch after about an hour. Recoating too soon, for example after only six hours, causes the topcoat to wrinkle. Allow 16 to 24 hours, or choose a different primer suited to the surface if you cannot wait. A water-based topcoat over a primer that is only touch dry can cause crow’s feet, where the topcoat splits and the primer shows through.
Finish the year without the callbacks
The difference between a clean handover and a January callback is usually decided before the first coat: the preparation, the timing and the system. If you are closing out work before the shutdown, talk to the Prominent Paints technical team through the Professional Pact first.